Now the fun of making and prioritizing the fix-it and upgrade-it list. Some of key items:
Bridge Repairs
- Wind screen, needs new lexan or plexi
- Railing needs fix or replace
- Teak hand rails, need repair
- Canvas, reinstalled if I can find or replace
- Bimini. I think we have canvas, needs frame.
Cabin Trunk
- Railings need repair/replace
- Mast needs repair and boom replaced
Bow
- Bow rail fix/replace
- Fiberglass fix right below flybridge
- Center window glass replace
Electronics
- Still need to sort out what is worth keeping.
- Most likely radios stay and I start building new system around current Multi function chart plotter.
Hmmm. Typing it makes list look too long.